Eldorado Stone located in Greencastle, PA was the construction project for a 432,000 SF new manufacturing facility
	▪	1,405 CY of Foundation Concrete
	▪	3,220 CY of Tilt-up Panel Concrete
	▪	8,165 CY of Slab-on-Grade Concrete
	▪	1,445 CY of Exterior Concrete